Data / Workplace safety / New Jersey / Borough of Magnolia DPW
Borough of Magnolia DPW, Magnolia, NJ: 6 OSHA citations, $25,200 in penalties (2025 to 2026)
OSHA recorded 2 inspections at Borough of Magnolia DPW, 310 Otter Branch Drive, Magnolia, NJ 08049, between December 3, 2025 and January 27, 2026. 1 inspection ended in citations: 6 citations with $25,200 in initial penalties and $25,200 in current penalties. The latest citation was issued December 15, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 310 Otter Branch Drive, Magnolia, NJ 08049
- Industry
- 237310 Highway, Street, and Bridge Construction
- Ownership
- Local government
- Employees at the site
- 11 (as recorded at the latest inspection)
- Inspections
- 2, of which 1 with citations
- Citations
- 6
- Penalties
- $25,200 initial, $25,200 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| January 27, 2026 | January 27, 2026 | Follow-up | Partial | Safety | 0 | Not listed | osha.gov |
| December 3, 2025 | January 27, 2026 | Planned | Complete | Safety | 6 | $25,200 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| December 3, 2025 | 1910.132(d)(2) | General requirements | Other than serious | 5 | December 15, 2025 | $700 | $700 | osha.gov |
| December 3, 2025 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Serious | 10 | December 15, 2025 | $4,900 | $4,900 | osha.gov |
| December 3, 2025 | 1910.303(g)(1) | General | Serious | 10 | December 15, 2025 | $4,900 | $4,900 | osha.gov |
| December 3, 2025 | 1910.147(c)(1) | The control of hazardous energy (lockout/tagout) | Serious | 10 | December 15, 2025 | $4,900 | $4,900 | osha.gov |
| December 3, 2025 | 1910.144(a)(3) | Safety color code for marking physical hazards | Serious | 10 | December 15, 2025 | $4,900 | $4,900 | osha.gov |
| December 3, 2025 | 1910.37(a)(4) | Maintenance, safeguards, and operational features for exit routes | Serious | 10 | December 15, 2025 | $4,900 | $4,900 | osha.gov |
Also on SpecStream
- All OSHA citations in Highway, Street, and Bridge Construction in New Jersey
- OSHA citations in New Jersey
- 29 CFR 1910.37, Maintenance, safeguards, and operational features for exit routes: all citations
- 29 CFR 1910.144, Safety color code for marking physical hazards: all citations
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.