Data / Workplace safety / Michigan / Beacon Park Finishing LLC
Beacon Park Finishing LLC, Roseville, MI: 21 OSHA citations, $7,900 in penalties (2021 to 2023)
OSHA recorded 6 inspections at Beacon Park Finishing LLC, 15765 Sturgeon ST, Roseville, MI 48066, between December 15, 2021 and June 12, 2023. 4 inspections ended in citations: 21 citations with $7,900 in initial penalties and $7,900 in current penalties. The latest citation was issued November 14, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 15765 Sturgeon ST, Roseville, MI 48066
- Industry
- 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
- Ownership
- Private
- Employees at the site
- 14 (as recorded at the latest inspection)
- Inspections
- 6, of which 4 with citations
- Citations
- 21
- Penalties
- $7,900 initial, $7,900 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| June 12, 2023 | June 12, 2024 | Referral | Partial | Health | 2 | $0 | osha.gov |
| April 3, 2023 | July 21, 2023 | Complaint | Partial | Safety | 2 | $0 | osha.gov |
| April 3, 2023 | January 31, 2025 | Complaint | Partial | Health | 7 | $3,000 | osha.gov |
| August 29, 2022 | July 27, 2023 | Follow-up | Partial | Safety | 0 | Not listed | osha.gov |
| February 11, 2022 | May 28, 2025 | Follow-up | Partial | Health | 0 | Not listed | osha.gov |
| December 15, 2021 | December 2, 2024 | Referral | Partial | Safety | 10 | $4,900 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| June 12, 2023 | 1910.141(a)(3)(i) | Sanitation | Other than serious | Not listed | November 14, 2023 | $0 | $0 | osha.gov |
| June 12, 2023 | 1910.138(b) | Hand protection | Other than serious | Not listed | November 14, 2023 | $0 | $0 | osha.gov |
| April 3, 2023 | 1910.132(d)(2) | General requirements | Other than serious | Not listed | July 18, 2023 | $0 | $0 | osha.gov |
| April 3, 2023 | 1910.134(h)(2) | Respiratory protection | Serious | 5 | July 18, 2023 | $0 | $0 | osha.gov |
| April 3, 2023 | 1910.134(c)(3) | Respiratory protection | Serious | 5 | July 18, 2023 | $0 | $0 | osha.gov |
| April 3, 2023 | 1910.134(c)(2) | Respiratory protection | Serious | 5 | July 18, 2023 | $1,500 | $1,500 | osha.gov |
| April 3, 2023 | 1910.1026(m)(1)(i) | Chromium (VI) | Serious | 5 | July 18, 2023 | $0 | $0 | osha.gov |
| April 3, 2023 | 1910.1026(l)(1)(iii) | Chromium (VI) | Serious | 5 | July 18, 2023 | $0 | $0 | osha.gov |
| April 3, 2023 | 1910.1026(d)(2)(vi) | Chromium (VI) | Serious | 5 | July 18, 2023 | $1,500 | $1,500 | osha.gov |
| April 3, 2023 | 408.11223(1) | Other than serious | Not listed | June 26, 2023 | $0 | $0 | osha.gov | |
| April 3, 2023 | 1910.22(a)(3) | General requirements | Other than serious | Not listed | June 26, 2023 | $0 | $0 | osha.gov |
| December 15, 2021 | 408.22129(1) | Other than serious | Not listed | March 4, 2022 | $400 | $400 | osha.gov | |
| December 15, 2021 | 1910.147(f)(3)(i) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 4, 2022 | $0 | $0 | osha.gov |
| December 15, 2021 | 1910.147(d)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 4, 2022 | $0 | $0 | osha.gov |
| December 15, 2021 | 1910.147(c)(7)(i) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 4, 2022 | $0 | $0 | osha.gov |
| December 15, 2021 | 1910.147(c)(7)(iv) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 4, 2022 | $0 | $0 | osha.gov |
| December 15, 2021 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 4, 2022 | $1,500 | $1,500 | osha.gov |
| December 15, 2021 | 1910.333(a)(1) | Selection and use of work practices | Serious | 5 | March 4, 2022 | $1,500 | $1,500 | osha.gov |
| December 15, 2021 | 1910.335(a)(1)(i) | Safeguards for personnel protection | Serious | 5 | March 4, 2022 | $0 | $0 | osha.gov |
| December 15, 2021 | 1910.332(b)(1) | Training | Serious | 5 | March 4, 2022 | $0 | $0 | osha.gov |
| December 15, 2021 | 408.13308(1) | Serious | 5 | March 4, 2022 | $1,500 | $1,500 | osha.gov |
Also on SpecStream
- All OSHA citations in Coating, Engraving, Heat Treating, and Allied Activities in Michigan
- OSHA citations in Michigan
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.1026, Chromium (VI): all citations
- 29 CFR 1910.134, Respiratory protection: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.