Data / Workplace safety / Texas / Be Masonry, LLC
Be Masonry, LLC, Waxahachie, TX: 8 OSHA citations, $9,430 in penalties (2023)
OSHA recorded 1 inspection at Be Masonry, LLC, 2253 Cooper River Trail, Waxahachie, TX 75165, on October 17, 2023. 1 inspection ended in citations: 8 citations with $21,431 in initial penalties and $9,430 in current penalties. The latest citation was issued January 22, 2024.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 2253 Cooper River Trail, Waxahachie, TX 75165
- Industry
- 238140 Masonry Contractors
- Ownership
- Private
- Employees at the site
- 5 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 8
- Penalties
- $21,431 initial, $9,430 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| October 17, 2023 | August 5, 2025 | Planned | Partial | Health | 8 | $9,430 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| October 17, 2023 | 1926.1153(d)(2)(i) | Respirable crystalline silica | Serious | 5 | January 22, 2024 | $0 | $0 | osha.gov |
| October 17, 2023 | 1926.1153(c)(1) | Respirable crystalline silica | Serious | 5 | January 22, 2024 | $2,765 | $1,217 | osha.gov |
| October 17, 2023 | 1926.454(a) | Training requirements | Serious | 1 | January 22, 2024 | $2,074 | $913 | osha.gov |
| October 17, 2023 | 1926.451(g)(4)(i) | General requirements | Serious | 5 | January 22, 2024 | $3,457 | $1,521 | osha.gov |
| October 17, 2023 | 1926.451(e)(1) | General requirements | Serious | 5 | January 22, 2024 | $3,457 | $1,521 | osha.gov |
| October 17, 2023 | 1926.451(b)(1) | General requirements | Serious | 5 | January 22, 2024 | $4,148 | $1,825 | osha.gov |
| October 17, 2023 | 1926.300(b)(1) | General requirements | Serious | 5 | January 22, 2024 | $2,765 | $1,217 | osha.gov |
| October 17, 2023 | 1926.102(a)(1) | Eye and face protection | Serious | 5 | January 22, 2024 | $2,765 | $1,217 | osha.gov |
Also on SpecStream
- All OSHA citations in Foundation, Structure, and Building Exterior Contractors in Texas
- OSHA citations in Texas
- 29 CFR 1926.451, General requirements: all citations
- 29 CFR 1926.1153, Respirable crystalline silica: all citations
- 29 CFR 1926.102, Eye and face protection: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.