Data / Workplace safety / Minnesota / Associated Finishing Inc
Associated Finishing Inc, Mankato, MN: 9 OSHA citations, $5,000 in penalties (2023)
OSHA recorded 2 inspections at Associated Finishing Inc, 320 Mallard Lane, Mankato, MN 56001, between April 3, 2023 and May 2, 2023. 2 inspections ended in citations: 9 citations with $10,000 in initial penalties and $5,000 in current penalties. The latest citation was issued October 12, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 320 Mallard Lane, Mankato, MN 56001
- Industry
- 325510 Paint and Coating Manufacturing
- Ownership
- Private
- Employees at the site
- 70 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 9
- Penalties
- $10,000 initial, $5,000 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| May 2, 2023 | November 15, 2024 | Referral | Partial | Health | 5 | $4,400 | osha.gov |
| April 3, 2023 | April 17, 2024 | Planned | Complete | Safety | 4 | $600 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| May 2, 2023 | 1910.107(b)(9) | Spray finishing using flammable and combustible materials | Other than serious | Not listed | October 12, 2023 | $800 | $440 | osha.gov |
| May 2, 2023 | 1910.138(a) | Hand protection | Serious | Not listed | October 12, 2023 | $1,600 | $880 | osha.gov |
| May 2, 2023 | 1910.132(a) | General requirements | Serious | Not listed | October 12, 2023 | $1,600 | $880 | osha.gov |
| May 2, 2023 | 1910.107(c)(6) | Spray finishing using flammable and combustible materials | Serious | Not listed | October 12, 2023 | $2,400 | $1,320 | osha.gov |
| May 2, 2023 | 1910.107(b)(5)(iv) | Spray finishing using flammable and combustible materials | Serious | Not listed | October 12, 2023 | $1,600 | $880 | osha.gov |
| April 3, 2023 | 52050675 | Other than serious | Not listed | September 6, 2023 | $200 | $100 | osha.gov | |
| April 3, 2023 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | September 6, 2023 | $200 | $100 | osha.gov |
| April 3, 2023 | 1910.106(e)(6)(ii) | Flammable liquids | Other than serious | Not listed | September 6, 2023 | $1,000 | $100 | osha.gov |
| April 3, 2023 | 1910.106(d)(4)(iii) | Flammable liquids | Serious | Not listed | September 6, 2023 | $600 | $300 | osha.gov |
Also on SpecStream
- All OSHA citations in Paint, Coating, and Adhesive Manufacturing in Minnesota
- OSHA citations in Minnesota
- 29 CFR 1910.107, Spray finishing using flammable and combustible materials: all citations
- 29 CFR 1910.106, Flammable liquids: all citations
- 29 CFR 1910.132, General requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.