Data / Workplace safety / Ohio / Appalachian Wood Floors, Inc.
Appalachian Wood Floors, Inc., Portsmouth, OH: 34 OSHA citations, $231,094 in penalties (2022 to 2024)
OSHA recorded 7 inspections at Appalachian Wood Floors, Inc., 838 Campbell Ave., Portsmouth, OH 45662, between May 24, 2022 and May 30, 2024. 6 inspections ended in citations: 34 citations with $509,620 in initial penalties and $231,094 in current penalties. The latest citation was issued November 20, 2024.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 838 Campbell Ave., Portsmouth, OH 45662
- Industry
- 321918 Other Millwork (including Flooring)
- Ownership
- Private
- Employees at the site
- 101 (as recorded at the latest inspection)
- Inspections
- 7, of which 6 with citations
- Citations
- 34
- Penalties
- $509,620 initial, $231,094 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| May 30, 2024 | Follow-up | Partial | Safety | 7 | $50,000 | osha.gov | |
| December 18, 2023 | May 17, 2024 | Referral | Partial | Safety | 2 | $0 | osha.gov |
| June 7, 2023 | October 3, 2023 | Referral | Partial | Safety | 1 | $7,736 | osha.gov |
| October 5, 2022 | May 11, 2026 | Referral | Partial | Safety | 19 | $161,321 | osha.gov |
| June 2, 2022 | August 4, 2023 | Referral | Partial | Health | 0 | Not listed | osha.gov |
| May 24, 2022 | June 14, 2022 | Referral | Records only | Health | 1 | $1,037 | osha.gov |
| May 24, 2022 | August 4, 2023 | Complaint | Partial | Safety | 4 | $11,000 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| May 30, 2024 | 1910.305(b)(1)(i) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | November 20, 2024 | $0 | $0 | osha.gov |
| May 30, 2024 | 1910.303(g)(2)(ii) | General | Other than serious | Not listed | November 20, 2024 | $0 | $0 | osha.gov |
| May 30, 2024 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Repeat | 5 | November 20, 2024 | $22,818 | $13,493 | osha.gov |
| May 30, 2024 | 1910.22(c) | General requirements | Repeat | 5 | November 20, 2024 | $57,044 | $28,522 | osha.gov |
| May 30, 2024 | 1910.37(a)(3) | Maintenance, safeguards, and operational features for exit routes | Serious | 5 | November 20, 2024 | $0 | $0 | osha.gov |
| May 30, 2024 | 1910.36(g)(2) | Design and construction requirements for exit routes | Serious | 5 | November 20, 2024 | $0 | $0 | osha.gov |
| May 30, 2024 | 1910.36(c)(2) | Design and construction requirements for exit routes | Serious | 10 | November 20, 2024 | $15,970 | $7,985 | osha.gov |
| December 18, 2023 | 1910.305(b)(2)(i) | Wiring methods, components, and equipment for general use | Serious | 10 | April 24, 2024 | $15,970 | $0 | osha.gov |
| December 18, 2023 | 1910.213(d)(1) | Woodworking machinery requirements | Serious | 10 | April 24, 2024 | $15,970 | $0 | osha.gov |
| June 7, 2023 | 1910.213(r)(4) | Woodworking machinery requirements | Serious | 10 | August 23, 2023 | $15,469 | $7,736 | osha.gov |
| October 5, 2022 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Repeat | 5 | March 23, 2023 | $22,101 | $11,050 | osha.gov |
| October 5, 2022 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Repeat | 10 | March 23, 2023 | $30,938 | $15,468 | osha.gov |
| October 5, 2022 | 1910.219(f)(3) | Mechanical power-transmission apparatus | Repeat | 10 | March 23, 2023 | $30,938 | $15,468 | osha.gov |
| October 5, 2022 | 1910.212(a)(1) | General requirements for all machines | Repeat | 10 | March 23, 2023 | $30,938 | $15,468 | osha.gov |
| October 5, 2022 | 1910.28(b)(11)(ii) | Duty to have fall protection and falling object protection | Repeat | 5 | March 23, 2023 | $17,679 | $8,839 | osha.gov |
| October 5, 2022 | 1910.22(c) | General requirements | Repeat | 10 | March 23, 2023 | $30,938 | $15,468 | osha.gov |
| October 5, 2022 | 1910.303(b)(2) | General | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.303(b)(1) | General | Serious | 5 | March 23, 2023 | $11,050 | $5,525 | osha.gov |
| October 5, 2022 | 1910.213(r)(4) | Woodworking machinery requirements | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.213(d)(1) | Woodworking machinery requirements | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.213(b)(6) | Woodworking machinery requirements | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.147(c)(7)(iii) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 23, 2023 | $0 | $0 | osha.gov |
| October 5, 2022 | 1910.147(c)(7)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.147(d) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 23, 2023 | $0 | $0 | osha.gov |
| October 5, 2022 | 1910.147(c)(4)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.147(c)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| October 5, 2022 | 1910.22(a)(1) | General requirements | Serious | 5 | March 23, 2023 | $8,840 | $4,420 | osha.gov |
| October 5, 2022 | OSH Act section 5(a)(1) | General duty clause | Serious | 10 | March 23, 2023 | $15,469 | $7,735 | osha.gov |
| May 24, 2022 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Serious | 5 | June 29, 2022 | $8,718 | $0 | osha.gov |
| May 24, 2022 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 5 | June 29, 2022 | $8,718 | $5,500 | osha.gov |
| May 24, 2022 | 1910.28(b)(11)(ii) | Duty to have fall protection and falling object protection | Serious | 5 | June 29, 2022 | $10,461 | $0 | osha.gov |
| May 24, 2022 | 1910.22(c) | General requirements | Serious | 10 | June 29, 2022 | $14,357 | $5,500 | osha.gov |
| May 24, 2022 | 1904.41(a)(2) | Electronic submission of Employer Identification Number (EIN) and injury and illness records to OSHA | Other than serious | Not listed | June 1, 2022 | $1,482 | $1,037 | osha.gov |
Also on SpecStream
- All OSHA citations in Other Wood Product Manufacturing in Ohio
- OSHA citations in Ohio
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.213, Woodworking machinery requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.