Data / Workplace safety / Tennessee / American Water Heater Company
American Water Heater Company, Johnson City, TN: 16 OSHA citations, $26,400 in penalties (2024 to 2025)
OSHA recorded 2 inspections at American Water Heater Company, 1100 East Fairview Ave, Johnson City, TN 37601, between January 10, 2024 and March 26, 2025. 2 inspections ended in citations: 16 citations with $26,400 in initial penalties and $26,400 in current penalties. The latest citation was issued May 21, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 1100 East Fairview Ave, Johnson City, TN 37601
- Industry
- 333414 Heating Equipment (except Warm Air Furnaces) Manufacturing
- Ownership
- Private
- Employees at the site
- 807 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 16
- Penalties
- $26,400 initial, $26,400 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| March 26, 2025 | Accident | Partial | Safety | 2 | $5,800 | osha.gov | |
| January 10, 2024 | Planned | Complete | Safety | 14 | $20,600 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| March 26, 2025 | 1910.305(b)(1)(i) | Wiring methods, components, and equipment for general use | Other than serious | 1 | May 21, 2025 | $400 | $400 | osha.gov |
| March 26, 2025 | 1910.212(a)(3)(ii) | General requirements for all machines | Serious | 9 | May 21, 2025 | $5,400 | $5,400 | osha.gov |
| January 10, 2024 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Other than serious | 10 | April 5, 2024 | $0 | $0 | osha.gov |
| January 10, 2024 | 1910.305(b)(3)(ii) | Wiring methods, components, and equipment for general use | Other than serious | 5 | April 5, 2024 | $0 | $0 | osha.gov |
| January 10, 2024 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Other than serious | 5 | April 5, 2024 | $200 | $200 | osha.gov |
| January 10, 2024 | 1910.304(b)(3)(ii) | Wiring design and protection | Other than serious | 5 | April 5, 2024 | $200 | $200 | osha.gov |
| January 10, 2024 | 1910.303(b)(2) | General | Other than serious | 1 | April 5, 2024 | $400 | $400 | osha.gov |
| January 10, 2024 | 1910.178(m)(5)(ii) | Powered industrial trucks | Other than serious | 5 | April 5, 2024 | $200 | $200 | osha.gov |
| January 10, 2024 | 1910.178(a)(6) | Powered industrial trucks | Other than serious | 5 | April 5, 2024 | $200 | $200 | osha.gov |
| January 10, 2024 | 1910.22(a)(1) | General requirements | Other than serious | 5 | April 5, 2024 | $0 | $0 | osha.gov |
| January 10, 2024 | 1910.37(a)(3) | Maintenance, safeguards, and operational features for exit routes | Other than serious | 5 | April 5, 2024 | $200 | $200 | osha.gov |
| January 10, 2024 | 1910.219(f)(3) | Mechanical power-transmission apparatus | Serious | 6 | April 5, 2024 | $2,800 | $2,800 | osha.gov |
| January 10, 2024 | 1910.212(a)(3)(ii) | General requirements for all machines | Serious | 9 | April 5, 2024 | $5,400 | $5,400 | osha.gov |
| January 10, 2024 | 1910.212(a)(1) | General requirements for all machines | Serious | 7 | April 5, 2024 | $3,200 | $3,200 | osha.gov |
| January 10, 2024 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 5 | April 5, 2024 | $2,400 | $2,400 | osha.gov |
| January 10, 2024 | 1910.147(a)(2)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 9 | April 5, 2024 | $5,400 | $5,400 | osha.gov |
Also on SpecStream
- All OSHA citations in Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing in Tennessee
- OSHA citations in Tennessee
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
- 29 CFR 1910.212, General requirements for all machines: all citations
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.