Skip to the page

Data / Workplace safety / Texas / American Electric Power Inc.

American Electric Power Inc., Corpus Christi, TX: 6 OSHA citations, $82,750 in penalties (2026)

OSHA recorded 1 inspection at American Electric Power Inc., 600 Mestina ST., Corpus Christi, TX 78401, on March 25, 2026. 1 inspection ended in citations: 6 citations with $82,750 in initial penalties and $82,750 in current penalties. The latest citation was issued September 18, 2026.

SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.

Site
600 Mestina ST., Corpus Christi, TX 78401
Industry
221122 Electric Power Distribution
Ownership
Private
Employees at the site
100 (as recorded at the latest inspection)
Inspections
1, of which 1 with citations
Citations
6
Penalties
$82,750 initial, $82,750 current

Inspections

Every inspection OSHA opened at this site since November 3, 2021.

OpenedClosedTypeScopeFocusCitationsCurrent penaltiesSource
March 25, 2026Fatality or catastrophePartialSafety6$82,750osha.gov

Citations

One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.

Inspection openedStandard citedStandard titleTypeGravityIssuedInitial penaltyCurrent penaltySource
March 25, 20261910.269(m)(3)(ii)Electric power generation, transmission, and distributionSerious10September 18, 2026$16,550$16,550osha.gov
March 25, 20261910.269(l)(4)(ii)Electric power generation, transmission, and distributionSerious10September 18, 2026$16,550$16,550osha.gov
March 25, 20261910.269(l)(1)(iii)Electric power generation, transmission, and distributionSerious10September 18, 2026$16,550$16,550osha.gov
March 25, 20261910.269(e)(3)Electric power generation, transmission, and distributionSerious10September 18, 2026$16,550$16,550osha.gov
March 25, 20261910.269(c)(2)Electric power generation, transmission, and distributionSerious10September 18, 2026$0$0osha.gov
March 25, 20261910.269(c)(1)(ii)Electric power generation, transmission, and distributionSerious10September 18, 2026$16,550$16,550osha.gov

Also on SpecStream

Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.