Data / Workplace safety / New York / Advantage Metalwork & Finishing, LLC
Advantage Metalwork & Finishing, LLC, Rochester, NY: 17 OSHA citations, $27,490 in penalties (2023 to 2025)
OSHA recorded 3 inspections at Advantage Metalwork & Finishing, LLC, 1000 University Ave Suite 700, Rochester, NY 14607, between May 16, 2023 and November 25, 2025. 3 inspections ended in citations: 17 citations with $41,385 in initial penalties and $27,490 in current penalties. The latest citation was issued January 27, 2026.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 1000 University Ave Suite 700, Rochester, NY 14607
- Industry
- 332322 Sheet Metal Work Manufacturing
- Ownership
- Private
- Employees at the site
- 90 (as recorded at the latest inspection)
- Inspections
- 3, of which 3 with citations
- Citations
- 17
- Penalties
- $41,385 initial, $27,490 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| November 25, 2025 | March 3, 2026 | Follow-up | Partial | Health | 1 | $0 | osha.gov |
| October 31, 2024 | Complaint | Partial | Health | 9 | $14,600 | osha.gov | |
| May 16, 2023 | November 2, 2023 | Complaint | Partial | Safety | 7 | $12,890 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| November 25, 2025 | 1910.134(c) | Respiratory protection | Other than serious | Not listed | January 27, 2026 | $0 | $0 | osha.gov |
| October 31, 2024 | 1910.107(g)(7) | Spray finishing using flammable and combustible materials | Other than serious | Not listed | January 15, 2025 | $0 | $0 | osha.gov |
| October 31, 2024 | 1910.1200(h)(1) | Hazard communication | Serious | 5 | January 15, 2025 | $0 | $0 | osha.gov |
| October 31, 2024 | 1910.1200(e)(1) | Hazard communication | Serious | 5 | January 15, 2025 | $6,453 | $3,900 | osha.gov |
| October 31, 2024 | 1910.242(b) | Hand and portable powered tools and equipment, general | Serious | 1 | January 15, 2025 | $4,839 | $2,900 | osha.gov |
| October 31, 2024 | 1910.134(k)(3) | Respiratory protection | Serious | 5 | January 15, 2025 | $0 | $0 | osha.gov |
| October 31, 2024 | 1910.134(f)(2) | Respiratory protection | Serious | 5 | January 15, 2025 | $0 | $0 | osha.gov |
| October 31, 2024 | 1910.134(e)(1) | Respiratory protection | Serious | 5 | January 15, 2025 | $0 | $0 | osha.gov |
| October 31, 2024 | 1910.134(c) | Respiratory protection | Serious | 5 | January 15, 2025 | $6,453 | $3,900 | osha.gov |
| October 31, 2024 | 1910.107(e)(9) | Spray finishing using flammable and combustible materials | Serious | 5 | January 15, 2025 | $6,453 | $3,900 | osha.gov |
| May 16, 2023 | 1910.151(c) | Medical services and first aid | Other than serious | Not listed | July 17, 2023 | $0 | $0 | osha.gov |
| May 16, 2023 | 1910.303(b)(7)(i) | General | Serious | 5 | July 17, 2023 | $6,250 | $4,688 | osha.gov |
| May 16, 2023 | 1910.304(g)(5) | Wiring design and protection | Serious | 1 | July 17, 2023 | $0 | $0 | osha.gov |
| May 16, 2023 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 1 | July 17, 2023 | $0 | $0 | osha.gov |
| May 16, 2023 | 1910.303(b)(2) | General | Serious | 1 | July 17, 2023 | $4,687 | $3,515 | osha.gov |
| May 16, 2023 | 1910.107(b)(5)(i) | Spray finishing using flammable and combustible materials | Serious | 5 | July 17, 2023 | $0 | $0 | osha.gov |
| May 16, 2023 | 1910.107(b)(5)(i) | Spray finishing using flammable and combustible materials | Serious | 5 | July 17, 2023 | $6,250 | $4,688 | osha.gov |
Also on SpecStream
- All OSHA citations in Architectural and Structural Metals Manufacturing in New York
- OSHA citations in New York
- 29 CFR 1910.134, Respiratory protection: all citations
- 29 CFR 1910.107, Spray finishing using flammable and combustible materials: all citations
- 29 CFR 1910.1200, Hazard communication: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.