Data / Workplace safety / Kansas / Abm By Prodex, LLC.
Abm By Prodex, LLC., Topeka, KS: 5 OSHA citations, $9,733 in penalties (2023)
OSHA recorded 1 inspection at Abm By Prodex, LLC., 925 SW University BLVD. Building 12A /po Box 19233, Topeka, KS 66619, on October 4, 2023. 1 inspection ended in citations: 5 citations with $15,180 in initial penalties and $9,733 in current penalties. The latest citation was issued December 1, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 925 SW University BLVD. Building 12A /po Box 19233, Topeka, KS 66619
- Industry
- 326199 All Other Plastics Product Manufacturing
- Ownership
- Private
- Employees at the site
- 22 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 5
- Penalties
- $15,180 initial, $9,733 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| October 4, 2023 | December 27, 2024 | Referral | Partial | Safety | 5 | $9,733 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| October 4, 2023 | 1904.40(a) | Providing records to government representatives | Other than serious | Not listed | December 1, 2023 | $893 | $536 | osha.gov |
| October 4, 2023 | 1910.1200(h)(1) | Hazard communication | Serious | 5 | December 1, 2023 | $0 | $0 | osha.gov |
| October 4, 2023 | 1910.1200(e)(1) | Hazard communication | Serious | 5 | December 1, 2023 | $3,572 | $2,143 | osha.gov |
| October 4, 2023 | 1910.212(a)(1) | General requirements for all machines | Serious | 10 | December 1, 2023 | $6,250 | $4,375 | osha.gov |
| October 4, 2023 | 1910.178(l)(2)(ii) | Powered industrial trucks | Serious | 5 | December 1, 2023 | $4,465 | $2,679 | osha.gov |
Also on SpecStream
- All OSHA citations in Plastics Product Manufacturing in Kansas
- OSHA citations in Kansas
- 29 CFR 1910.1200, Hazard communication: all citations
- 29 CFR 1910.178, Powered industrial trucks: all citations
- 29 CFR 1910.212, General requirements for all machines: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.