Skip to the page

Data / Federal rules / 2026-08058

Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction

The Pipeline and Hazardous Materials Safety Administration published this final rule in the Federal Register on April 24, 2026. It took effect on August 3, 2026.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

This final rule makes a correction to the requirements for reconfirming the maximum allowable operating pressure of gas transmission lines.

Key facts

Document number
2026-08058
Type
Final rule
Action
Final rule; correcting amendment
Agency
Transportation Department; Pipeline and Hazardous Materials Safety Administration
Published
April 24, 2026
Takes effect
August 3, 2026
Dates
This rule is effective on August 3, 2026.
Docket
Docket No. PHMSA-2011-0023; Amdt. Nos. 191-26; 192-125
Regulation ID (RIN)
2137-AE72
Code of Federal Regulations
49 CFR 192
Topics
Natural gas; Pipeline safety
Significant
Yes, under Executive Order 12866
Pages
3

The document on federalregister.gov PDF

Other documents from the Pipeline and Hazardous Materials Safety Administration

Everything from the Pipeline and Hazardous Materials Safety Administration · Rules on natural gas · Rules on pipeline safety · Published in April 2026

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.