Data / Federal rules / 2025-12118
Pipeline Safety: Eliminating Burdensome and Duplicative Deadlines for Gas Pipeline Coating Damage Assessments and Remedial Actions
The Pipeline and Hazardous Materials Safety Administration published this proposed rule in the Federal Register on July 1, 2025. Comments closed on September 2, 2025.
SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.
What the agency says
PHMSA is proposing to revise the regulations related to coating damage assessments and remedial actions for gas transmission pipeline operators by adjusting the timeframe in which operators must perform external anti-corrosion coating assessments and any repairs following an unsatisfactory assessment result. This proposed change will provide significant cost savings to gas transmission pipeline operators, eliminate ineffective regulations, and simplify current requirements.
Key facts
- Document number
- 2025-12118
- Type
- Proposed rule
- Action
- Notice of proposed rulemaking (NPRM)
- Agency
- Transportation Department; Pipeline and Hazardous Materials Safety Administration
- Published
- July 1, 2025
- Comments due
- September 2, 2025
- Dates
- Persons interested in submitting written comments on this NPRM must do so by September 2, 2025.
- Docket
- Docket No. PHMSA-2025-0114
- Regulation ID (RIN)
- 2137-AF84
- Code of Federal Regulations
- 49 CFR 192
- Topics
- Natural gas; Pipeline safety; Pipelines
- Pages
- 5
Other documents from the Pipeline and Hazardous Materials Safety Administration
| Document | Type | Published |
|---|---|---|
| Hazardous Materials: Incorporation of ASME Code Section XII and the National Board Inspection Code 2026-19741 | Final rule | Sep 28 |
| Hazardous Materials: Allowing Fireworks Certification Agencies (FCAs) To Approve Professional Fireworks 2026-16111 | Final rule | Aug 7 |
| Hazardous Materials: Reducing Burdens on Domestic Companies Using Battery-Powered Equipment in Trades 2026-15823 | Final rule | Aug 4 |
| Hazardous Materials: Adoption of Department of Transportation Special Permit 21478 2026-15820 | Final rule | Aug 4 |
| Hazardous Materials: Adoption of Department of Transportation Special Permit 14175 2026-15819 | Final rule | Aug 4 |
| Hazardous Materials: Adoption of Department of Transportation Special Permit 21379 2026-15818 | Final rule | Aug 4 |
| Hazardous Materials: Adoption of Department of Transportation Special Permit 21287 2026-15817 | Final rule | Aug 4 |
| Hazardous Materials: Adoption of Department of Transportation Special Permits 12412 and 11646 Into the Hazardous Materials Regulations 2026-15816 | Final rule | Aug 4 |
Everything from the Pipeline and Hazardous Materials Safety Administration · Rules on natural gas · Rules on pipeline safety · Rules on pipelines · Published in July 2025
Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.