Skip to the page

Data / Federal rules / 2025-15141

Pipeline Safety: Clarifying Recordkeeping Requirements for Testing in MAOP Reconfirmation Regulation

The Pipeline and Hazardous Materials Safety Administration published this proposed rule in the Federal Register on August 8, 2025. Comments closed on September 8, 2025.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

PHMSA published a final rule containing a technical correction clarifying the applicability of the requirements for reconfirming the maximum allowable operating pressure of certain gas transmission lines. PHMSA received a petition for reconsideration of the final rule and is providing the public with the opportunity to submit comments on the technical correction and petition for reconsideration.

Key facts

Document number
2025-15141
Type
Proposed rule
Action
Notice of comment period
Agency
Transportation Department; Pipeline and Hazardous Materials Safety Administration
Published
August 8, 2025
Comments due
September 8, 2025
Dates
Comments are due on September 8, 2025.
Docket
Docket No. PHMSA-2025-0117
Regulation ID (RIN)
2137-AF80
Code of Federal Regulations
49 CFR 192
Pages
2

The document on federalregister.gov PDF

Other documents from the Pipeline and Hazardous Materials Safety Administration

Everything from the Pipeline and Hazardous Materials Safety Administration · Published in August 2025

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.