Skip to the page

Data / Federal rules / 2025-12115

Pipeline Safety: Clarifying Recordkeeping Requirements for Testing in MAOP Reconfirmation Regulation

The Pipeline and Hazardous Materials Safety Administration published this final rule in the Federal Register on July 1, 2025. It took effect on October 9, 2025.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

PHMSA is clarifying that certain recently adopted recordkeeping requirements for pressure testing do not apply retroactively when determining the applicability of the requirements for reconfirming the maximum allowable operating pressure of certain gas transmission lines.

Key facts

Document number
2025-12115
Type
Final rule
Action
Final rule; technical correction
Agency
Transportation Department; Pipeline and Hazardous Materials Safety Administration
Published
July 1, 2025
Takes effect
October 9, 2025
Dates
Effective on October 9, 2025.
Docket
Docket No. PHMSA-2025-0117; Amdt. No. 192-155
Regulation ID (RIN)
2137-AF80
Code of Federal Regulations
49 CFR 192
Topics
Natural gas; Pipeline safety
Pages
4

The document on federalregister.gov PDF

Other documents from the Pipeline and Hazardous Materials Safety Administration

Everything from the Pipeline and Hazardous Materials Safety Administration · Rules on natural gas · Rules on pipeline safety · Published in July 2025

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.