Skip to the page

Data / Federal awards / NAICS 238210 / BARRY WILLIAMS ELECTRIC INC

BARRY WILLIAMS ELECTRIC INC: 172 federal contract awards, $9.2 million obligated (FY2024 to FY2027)

BARRY WILLIAMS ELECTRIC INC (UEI JKRFPNDSPCD5), Waco, TX, received 172 federal prime contract awards with $9.2 million obligated in fiscal years 2024 to 2027, from 1 agency under 2 NAICS codes. Its largest buyer is Department of Transportation ($9.2 million) and its largest code is NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors.

SpecStream is the live web data engine for teams and agents. It reads every federal contract award on USAspending.gov and every open opportunity on SAM.gov, and this page is that reading. Ask for the awards in your niche and the winners, agencies, values and recompetes arrive in your sheet, CRM, Slack or agent as they are reported.

  • JKRFPNDSPCD5UEI
  • Waco, TXLocation
  • Small BusinessBusiness size
  • 172Contract awards
  • $9.2 millionObligated
  • 2023-10-12First action in window
  • 2026-09-15Latest action

Where the work is

NAICS codes, with the other winners in each.

NAICSIndustryAwardsObligated
238210Electrical Contractors and Other Wiring Installation Contractors80$6.7 million
335910Battery Manufacturing92$2.5 million

Buying agencies

AgencyAwardsObligated
Department of Transportation172$9.2 million

Obligations by fiscal year

Fiscal yearObligated
FY2024$2.2 million
FY2025$3 million
FY2026$4.1 million

Contract awards

The 50 largest of 172 awards by dollars obligated in fiscal years 2024 to 2027.

Award IDAgencyTypeNAICSWhat it buysObligated in windowAward valueStartsEndsPlace of performanceSource
6973GH25F01106Department of TransportationDelivery Order238210IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS INSTALLATION AND FULL POWER SYSTEM STUDY AT OILTON, TX (QZA) AR$835,724$835,724July 17, 2025October 31, 2026Oilton, TXusaspending.gov
6973GH26F00257Department of TransportationDelivery Order238210REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTALL THE ERMS WIRING, UPDATE THE EXISTING UNINTERRUPTED POWER S$439,031$439,031January 21, 2026July 6, 2026Richland, MOusaspending.gov
6973GH26F01322Department of TransportationDelivery Order238210SITE: WATFORD CITY, ND (QWA) ARSR JCN: 24012600 _______________________________________________ "COORDINATION MUST BE MADE WITHIN FOUR (4) C$421,557$421,557August 25, 2026October 28, 2026Sterling, NDusaspending.gov
6973GH26F00542Department of TransportationDelivery Order238210IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK (QAF) ATCBI JCN:23007870$397,635$397,635March 25, 2026March 2, 2027Chelsea, OKusaspending.gov
6973GH23F01839Department of TransportationDelivery Order238210BIL FUNDING, FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT FOR LUBBOCK, TX (LBBC) ATCT JCN: 19003$369,557$723,145September 12, 2023September 30, 2026Lubbock, TXusaspending.gov
6973GH25F01432Department of TransportationDelivery Order238210TO FUND THE FUEL STORAGE TANK (FST) REPLACEMENT AT LCH ASR.$312,000$312,000September 24, 2025May 31, 2026Lake Charles, LAusaspending.gov
6973GH26F00872Department of TransportationDelivery Order238210IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT WARRENTON,$302,291$302,291May 26, 2026August 12, 2026Vint Hill Farms, VAusaspending.gov
6973GH26F00338Department of TransportationDelivery Order238210IIJA FUNDED. NASHWAUK, MN (QJD) ARSR JCN:19004780 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT $299,829$299,829January 28, 2026October 31, 2026Nashwauk, MNusaspending.gov
6973GH22F01699Department of TransportationDelivery Order238210BIL FUNDING FOR SITE SURVEY, DESIGN, EG INSTALLATION AND LPGBS AT ALBUQUERQUE, NM (ABQF) ASR JCN:22002452 / LPGBS BIL JCN 1404090$294,485$579,610September 12, 2022March 31, 2026Albuquerque, NMusaspending.gov
6973GH24F00921Department of TransportationDelivery Order335910DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION AT DAL-FT WORTH, TX (D10) CPDS, JCN:20011703, HOUSTON, TX (ZHU) CPDS, JCN:22006503, A$247,402$247,402May 22, 2024April 27, 2025Woodway, TXusaspending.gov
6973GH24F00906Department of TransportationDelivery Order238210BIL FUNDS. INITIAL INSTALLATION FUNDING FOR THE INDOOR EG, PROPANE FST AND ERMS AT THE WESTMINSTER, MD (EMI) VOR. JCN:23009034$246,416$246,416May 21, 2024October 4, 2024Westminster, MDusaspending.gov
6973GH22F01650Department of TransportationDelivery Order238210BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT AUSTIN, TX (VNK) ALS JCN:22001359$209,256$494,381September 8, 2022January 30, 2026Austin, TXusaspending.gov
6973GH26F00896Department of TransportationDelivery Order238210OPS FUNDED DEMO AND INSTALL FOR ELECTRICAL REFURBISHMENT PROJECT AT (GJT)ARSR IN GRAND JUNCTION, CO., JCN: 18062203 PER NDP, PMO$200,354$200,354June 9, 2026September 30, 2026De Beque, COusaspending.gov
6973GH23F01841Department of TransportationDelivery Order238210BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT FOR SALINA, KS (SLNC) ATCT JCN: 1900344$189,566$543,154September 12, 2023October 31, 2026Salina, KSusaspending.gov
6973GH22F01709Department of TransportationDelivery Order238210BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION FOR SAN ANTONIO, TX (ANT) ALS JCN:22002701$186,677$471,803September 12, 2022September 30, 2025Boerne, TXusaspending.gov
6973GH24F00794Department of TransportationDelivery Order238210CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE BIRMINGHAM, AL (BHM) ASR PER THE RFQ-24-14 BID PACK$181,058$181,058May 17, 2024October 9, 2024Birmingham, ALusaspending.gov
6973GH24F00389Department of TransportationDelivery Order238210BIL FUNDS. UPS INSTALLATION. JCN:18066554, QHA ARSR, CUMMINGTON MA. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INS$170,884$170,884February 12, 2024October 31, 2026Cummington, MAusaspending.gov
6973GH24F00424Department of TransportationDelivery Order238210UPS INSTALLATION. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT CHARLOTTESVILLE, VA (CHO) ASR PER RFQ$168,209$168,209March 5, 2024September 30, 2025Charlottesville, VAusaspending.gov
6973GH22F01655Department of TransportationDelivery Order238210BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT LONGVIEW, TX (GGGA) ATCT JCN:22001757$164,285$449,411September 8, 2022September 30, 2025Longview, TXusaspending.gov
6973GH24F01306Department of TransportationDelivery Order238210CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LONGVIEW, TX (GGG) ASR PER THE RFQ-24-20 BID PACKAG$148,950$148,950August 21, 2024February 28, 2025Arp, TXusaspending.gov
6973GH23F01641Department of TransportationDelivery Order238210ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT SYRACUSE, NY (SYRD) ALS JCN: 18028253$145,623$374,930August 9, 2023August 17, 2026East Syracuse, NYusaspending.gov
6973GH26F00244Department of TransportationDelivery Order238210FST FUNDED. 2024 DC BUS DEMO BASELINE SCOPE: SITE SURVEY TRAVEL AND REPORT, DESIGN AND INSTALL FUNDING AT LYNCHBURG, VA (LYHA) RCAG JCN:2401$138,869$138,869January 6, 2026December 30, 2026Lynchburg, VAusaspending.gov
6973GH26F00246Department of TransportationDelivery Order238210FST FUNDS. 2024 DC BUS DEMO BASELINE SCOPE: SITE SURVEY TRAVEL AND REPORT, DESIGN AND INSTALL FUNDING AT CEDAR RAPIDS, IA (CID) RCAG JCN: 24$137,412$137,412January 12, 2026October 31, 2026Fairfax, IAusaspending.gov
6973GH26F00237Department of TransportationDelivery Order238210FST 2024 DC BUS DEMO BASELINE SITE SURVEY TRAVEL & REPORT, DESIGN AND INSTALL FUNDING AT GAGE, OK (GAGA) RCAG JCN:24016524$137,412$137,412January 6, 2026October 30, 2026Gage, OKusaspending.gov
6973GH25F01253Department of TransportationDelivery Order335910IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:25016040 & LOC:QSJ RCLR, JCN:25015952 & LOC:QXW RCLR, JCN:25016042 & LOC:QS$124,910$124,910August 26, 2025August 4, 2026Woodway, TXusaspending.gov
6973GH24F00097Department of TransportationDelivery Order238210BIL FUNDS: UPS REPLACEMENT AND FULL AFHA FOR BAD ASR, LOCATED IN BARKSDALE AFB, LA. JCN:19005399$121,429$121,429December 13, 2023December 13, 2024Barksdale Afb, LAusaspending.gov
6973GH24F00509Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE KELLER, TX (FTWG) ARSR PER THE RFQ-24-13$110,772$110,772March 15, 2024December 31, 2024Keller, TXusaspending.gov
6973GH25F00044Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE TEXARKANA, AR (TXK) ARSR PER THE RFQ-24-$107,800$107,800November 12, 2024February 11, 2026Genoa, ARusaspending.gov
6973GH25F00280Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE FAYETTEVILLE (FYV) ASR (AR2) PER THE RFQ$102,439$102,439January 13, 2025July 11, 2025West Fork, ARusaspending.gov
6973GH23F00587Department of TransportationDelivery Order238210ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND DIESEL FST INSTALLATION AT EAGLE PEAK, TX (QNW) ATCT JCN: 18026736$100,271$329,577February 8, 2023December 31, 2024Kent, TXusaspending.gov
6973GH23F00090Department of TransportationDelivery Order238210BIL: CONDUCT SITE VISIT (TRAVEL AND SITE SURVEY REPORT), DESIGN, AND FST INSTALLATION AT BYHALIA, MS (QYB) ARSR. JCN: 18027753$99,154$328,461November 10, 2022October 31, 2024Woodway, TXusaspending.gov
6973GH25F00307Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE AMARILLO, TX (AMA) ASR PER THE RFQ-25-03$97,525$97,525December 23, 2024February 27, 2026Amarillo, TXusaspending.gov
6973GH23F00070Department of TransportationDelivery Order238210BIL: CONDUCT SITE VISIT (TRAVEL AND SITE SURVEY REPORT), DESIGN, AND FST INSTALLATION AT HALEYVILLE, AL (QPC) ARSR. JCN: 18028142$95,578$324,885November 4, 2022October 31, 2024Russellville, ALusaspending.gov
6973GH24F01028Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE ATLANTA, GA, ATLD ASDE PER THE RFQ-24-15$93,006$93,006June 24, 2024November 14, 2024Atlanta, GAusaspending.gov
6973GH25F00278Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LITC) ATCT (AR2) PER TH$88,674$88,674January 13, 2025June 9, 2025Little Rock, ARusaspending.gov
6973GH24F01525Department of TransportationDelivery Order238210THIS REQUISITION IS FOR THE INSTALLATION OF SERVICES FOR EFFORTS ASSOCIATED TO THE SYSTEM SUPPORT FACILITY (SSF, BUILDING 196)/PROGRAM SUPPO$88,458$88,458September 16, 2024April 25, 2025Oklahoma City, OKusaspending.gov
6973GH26F00670Department of TransportationDelivery Order238210IIJA FUNDED. CORPUS CHRISTI, TX (CRPA) ASR JCN:18066426 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUI$85,364$85,364April 28, 2026July 10, 2026Corpus Christi, TXusaspending.gov
6973GH24F00452Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT FARGO, ND (FAR) ASR PER RFQ-24-05 BID PACKAG$83,987$83,987March 1, 2024August 16, 2024Fargo, NDusaspending.gov
6973GH25F00279Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LIT) ASR (AR2) PER THE $81,061$81,061January 13, 2025June 9, 2025Little Rock, ARusaspending.gov
6973GH24F00919Department of TransportationDelivery Order335910BIL DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. OBERLIN, OH (ZOB) CPDS, JCN:23004268$78,078$78,078May 22, 2024June 1, 2024Woodway, TXusaspending.gov
6973GH25F00043Department of TransportationDelivery Order238210BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE FORT SMITH, AR (FSM) ASR PER THE RFQ-24-$77,285$77,285November 12, 2024April 30, 2025Fort Smith, ARusaspending.gov
6973GH23F00069Department of TransportationDelivery Order238210*BIL*: CONDUCT SITE VISIT (TRAVEL AND SITE SURVEY REPORT), DESIGN, AND FST INSTALLATION AT HUNTSVILLE, AL (HSV) ALS. JCN: 1503243$71,367$300,673November 4, 2022December 30, 2024Woodway, TXusaspending.gov
6973GH23F00717Department of TransportationDelivery Order238210BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT DAISETTA, TX (DAS) VOR JCN: 1500535$64,089$293,396March 14, 2023October 31, 2024Hull, TXusaspending.gov
6973GH23F00089Department of TransportationDelivery Order238210BIL: CONDUCT SITE VISIT (TRAVEL AND SITE SURVEY REPORT), DESIGN, AND FST INSTALLATION AT HUNTSVILLE, AL (HSVA) ASR. JCN: 1503244$61,713$291,020November 10, 2022December 30, 2024Woodway, TXusaspending.gov
6973GH25F01255Department of TransportationDelivery Order335910IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:25015953 & LOC:QX7 RCLR, JCN:25016231 & LOC:RDD RCLR.$56,573$56,573August 26, 2025August 6, 2026Woodway, TXusaspending.gov
6973GH26F00927Department of TransportationDelivery Order238210OPS FUNDED (BGR)ATCT - MDPE, ELECTRICAL POWER REPLACEMENT (MDPE), IN BANGOR, ME, JCN:25015948, PER ES, PMO.$50,067$50,067June 9, 2026September 30, 2026Bangor, MEusaspending.gov
6973GH26F00272Department of TransportationDelivery Order335910IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001388 & LOC:CLEA RTR, JCN:23001391 & LOC:CLEG RTR. FUNDING BWC FOR BATTE$49,149$49,149January 23, 2026January 1, 2027Woodway, TXusaspending.gov
6973GH23F00071Department of TransportationDelivery Order238210BIL FUNDS: CONDUCT SITE VISIT (TRAVEL AND SITE SURVEY REPORT), DESIGN, AND DIESEL FST INSTALLATION AT OAKDALE, PA (PIT) ARSR. JCN: 18028053$48,769$278,076November 2, 2022October 31, 2025Woodway, TXusaspending.gov
6973GH24F01189Department of TransportationDelivery Order2382102024 OUTDOOR EG BASELINE SITE SURVEY, DESIGN AND INSTALL FUNDING FOR SAN ANTONIO, TX (ANTA) LOC JCN: 22001117$48,724$48,724July 29, 2024September 30, 2025San Antonio, TXusaspending.gov
6973GH25F00704Department of TransportationDelivery Order335910IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001284 & LOC:AUS RTR, JCN:23001354 & LOC:T82 RCAG. FUNDING BULL WILLIAMS $45,010$45,010April 7, 2025April 17, 2026Woodway, TXusaspending.gov

Also on SpecStream

Updated October 6, 2026. Read from USAspending.gov. Public U.S. federal spending data (U.S. Department of the Treasury). Obligations are the contract actions dated in fiscal years 2024 to 2027 of the USAspending.gov award archive of 2026-10-06; a contract's total value is its current value as USAspending reports it, including earlier years. Recipients are matched on their SAM.gov UEI, never on the name, and are shown as the government prints them. Sole proprietorships and opted-out entities count in the totals and are not named. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.