Data / Environmental compliance / New Mexico
Environmental compliance in New Mexico: 736 facilities, $1,240,299,533 in penalties (2021 to 2026)
EPA's ECHO database lists 736 facilities in New Mexico with a formal enforcement action, penalties of $5,000 or more, three or more quarters in significant noncompliance or a federal case in the five years to November 1, 2026: 688 formal actions, 1,193 informal actions and $1,240,299,533 in penalties.
SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.
- State
- New Mexico
- Facilities
- 736
- Formal enforcement actions
- 688
- Informal actions
- 1,193
- Penalties
- $1,240,299,533 ($66,351,347 from federal cases)
- Facilities with three or more quarters in significant noncompliance
- 330
Industries with the largest penalties
| Industry | NAICS | Facilities | Penalties |
|---|
| Oil and Gas Extraction | 2111 | 168 | $1,101,037,822 |
| Petroleum and Coal Products Manufacturing | 3241 | 7 | $69,224,167 |
| Pipeline Transportation of Natural Gas | 4862 | 3 | $31,864,278 |
| Warehousing and Storage | 4931 | 2 | $10,329,997 |
| Oilseed and Grain Farming | 1111 | 1 | $2,091,364 |
| Cement and Concrete Product Manufacturing | 3273 | 5 | $1,081,416 |
| Water, Sewage and Other Systems | 2213 | 10 | $705,185 |
| Nonmetallic Mineral Mining and Quarrying | 2123 | 2 | $495,765 |
| Colleges, Universities, and Professional Schools | 6113 | 3 | $445,526 |
| Building Material and Supplies Dealers | 4441 | 27 | $427,096 |
| Semiconductor and Other Electronic Component Manufacturing | 3344 | 3 | $251,441 |
| Rail Transportation | 4821 | 1 | $190,485 |
| Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing | 3327 | 1 | $160,000 |
| Building Finishing Contractors | 2383 | 2 | $151,252 |
| Scientific Research and Development Services | 5417 | 2 | $106,574 |
| National Security and International Affairs | 9281 | 3 | $86,495 |
| Support Activities for Air Transportation | 4881 | 5 | $77,690 |
| Other Support Services | 5619 | 1 | $62,760 |
| Amusement Parks and Arcades | 7131 | 1 | $50,000 |
| General Medical and Surgical Hospitals | 6221 | 1 | $50,000 |
| Other Pipeline Transportation | 4869 | 1 | $30,536 |
| Land Subdivision | 2372 | 1 | $30,000 |
| Health and Personal Care Retailers | 4561 | 1 | $25,875 |
| Electric Power Generation, Transmission and Distribution | 2211 | 4 | $22,900 |
| Motion Picture and Video Industries | 5121 | 1 | $20,260 |
| Coating, Engraving, Heat Treating, and Allied Activities | 3328 | 3 | $16,170 |
| Architectural and Structural Metals Manufacturing | 3323 | 1 | $12,600 |
| Engine, Turbine, and Power Transmission Equipment Manufacturing | 3336 | 1 | $7,500 |
| Automotive Parts, Accessories, and Tire Retailers | 4413 | 1 | $7,500 |
| Tobacco Manufacturing | 3122 | 1 | $7,100 |
| Management, Scientific, and Technical Consulting Services | 5416 | 1 | $6,000 |
| Plastics Product Manufacturing | 3261 | 2 | $5,600 |
| Animal Slaughtering and Processing | 3116 | 1 | $4,000 |
| Waste Treatment and Disposal | 5622 | 4 | $2,637 |
| Lawn and Garden Equipment and Supplies Retailers | 4442 | 1 | $2,000 |
| Grocery and Related Product Merchant Wholesalers | 4244 | 1 | $2,000 |
| Nonresidential Building Construction | 2362 | 1 | $0 |
| Automobile Dealers | 4411 | 2 | $0 |
| Remediation and Other Waste Management Services | 5629 | 1 | $0 |
| Offices of Dentists | 6212 | 20 | $0 |
Facilities with the largest penalties
Ranked by penalties of the last five years. Each row links to EPA's facility report.
| Facility | City | State | Formal actions | Penalties | Quarters in significant noncompliance | Latest penalty | Source |
|---|
| Red Hills Gas Processing Plant | Jal | NM | 1 | $47,833,048 | 12 | December 5, 2024 | echo.epa.gov |
| Amen Corner CTB | Jal | NM | 1 | $40,336,818 | 12 | June 29, 2023 | echo.epa.gov |
| Ameredev, Azalea Battery | Jal | NM | 1 | $40,336,818 | 12 | June 29, 2023 | echo.epa.gov |
| HP Gas Pad | Jal | NM | 1 | $40,336,818 | 12 | June 29, 2023 | echo.epa.gov |
| Nandina CTB | Jal | NM | 1 | $40,336,818 | 12 | June 29, 2023 | echo.epa.gov |
| Red Bud CTB | Jal | NM | 1 | $40,336,818 | 12 | June 29, 2023 | echo.epa.gov |
| Artesia Refinery | Artesia | NM | 2 | $33,916,450 | 5 | May 27, 2025 | echo.epa.gov |
| Artesia Gas Plant | Artesia | NM | 2 | $33,504,866 | 12 | April 18, 2025 | echo.epa.gov |
| DCP Midstream, Eunice Gas Plant | Oil Center | NM | 2 | $33,504,866 | 0 | April 18, 2025 | echo.epa.gov |
| Magnum Compressor Station | Carlsbad | NM | 1 | $31,604,866 | 12 | April 18, 2025 | echo.epa.gov |
| West Turkey Track Booster | Maljamar | NM | 1 | $31,604,866 | 12 | April 18, 2025 | echo.epa.gov |
| Burton Flats Compressor Station | Carlsbad | NM | 1 | $31,604,866 | 9 | April 18, 2025 | echo.epa.gov |
| Dagger Draw Compressor Station | Artesia | NM | 1 | $31,604,866 | 0 | April 18, 2025 | echo.epa.gov |
| Double X Compressor Station | Jal | NM | 1 | $31,604,866 | 0 | April 18, 2025 | echo.epa.gov |
| Linam Ranch Plant | Hobbs | NM | 1 | $31,604,866 | 0 | April 18, 2025 | echo.epa.gov |
| Oil Center Booster Station | Oil Center | NM | 1 | $31,604,866 | 0 | April 18, 2025 | echo.epa.gov |
| Shugart Booster Station | Maljamar | NM | 1 | $31,604,866 | 0 | April 18, 2025 | echo.epa.gov |
| Zia II Gas Plant | Loco Hills | NM | 1 | $31,604,866 | 0 | April 18, 2025 | echo.epa.gov |
| Burlington Res/san Juan 30-6 #433___2278 | Bloomfield | NM | 3 | $28,200,000 | 0 | January 23, 2025 | echo.epa.gov |
| US Army Garrison White Sands Missile Range | White Sands Missile Range | NM | 3 | $9,930,097 | 12 | July 21, 2025 | echo.epa.gov |
| 32-7 No301 Salt Water Disposal | Navajo City | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Arnie NO1 Production Facility | Farmington | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Bert No1t Production Facility | Farmington | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Conocophillips, Day 2C | Turley | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Conocophillips, Palluche HZMC 1H | Bloomfield | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Conocophillips, San Juan 28-7 182N | Navajo Dam | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Conocophillips, San Juan 28-7 98N | Blanco | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Conocophillips, San Juan 31-6 Unit 212 | Navajo City | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Conocophillips -San Juan 32-8 Unit 221a | Archuleta | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Eaton White NO1 Bluffs Station | Farmington | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Fullerton Federal CDP NO3 | Bloomfield | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Davis a Fed 1N | Aztec | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Huerfanito Unit 79N | Huerfano | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Huerfanito Unit 85M | Huerfano | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Huerfanito Unit 98N | Huerfano | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Huerfanito Unit 98N | Huerfano | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Huerfanito Unit 99E | Bloomfield | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Huerfano Unit HZMC 1H | Huerfano | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Lindrith B Unit 78 | Lindrith | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Maddox Com 1a/777 CS | Turley | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Reid 22M | Blanco | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Sadie West 2M | Farmington | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, San Juan 29-7 139N | Navajo City | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, State Gas Com a 1N and 100S | Aztec | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Hilcorp, Sunray G 2A and G250 Twinned Location | Aztec | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Howell C 200s/howell C 1A | Navajo City | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Howell D350S/D1 Compressor Station | Archuleta | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Howell D353s/howell D4A Twinned Location | Aztec | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Huerfanito 151/10 Twinned Production Loc | Huerfano | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Lindrith Compressor Station | Lindrith | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Martin Gas Com 1 Production Location | Bloomfield | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| San Juan 30-6 Unit 85A No4085 | Navajo Dam | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| San Juan 32-7 Unit 238 | Turley | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| San Juan 32-8 No 227 CDP | Archuleta | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| San Juan 32-8 No233 CDP No47 Well Site | Archuleta | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Scott 102S & Scott 5A Twinned Production | Aztec | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| State Com L NO8 Compressor Station | Cedar Hill | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| State Com N No10 Compressor Station | Navajo City | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Tiger 12 Production Facility | Farmington | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Xto Energy, Grassy Canyon NO7 | Aztec | NM | 1 | $9,400,000 | 0 | January 23, 2025 | echo.epa.gov |
| Mewbourne, Cabra Nino 11 B3MD State Com 1H Battery | Hobbs | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, El Mar 21 Facility | Jal | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, FNR 17-20 B21P Fed Com 1H B31P 2H Battery | Malaga | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Forty Niner Ridge Unit 105H 106H Battery | Malaga | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Hoss 2 11 Federal Com Battery | Malaga | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Jennings Fed Com Facility | Jal | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Lindal Fed Com Facility | Malga | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Mad Dog 26 MD State Com 1H Battery | Hobbs | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Queen 23 24 Fed Com Facility | Malga | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Salado Draw 10 Fed Facility | Jal | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Salado Draw 9 Facility | Jal | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Speedwagon 27 Facility | Loving | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Toro 36 B3ap State Facility | Jal | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Toro B2CN State Facility | Jal | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Mewbourne, Yardbirds 3 Facility | Malga | NM | 2 | $5,500,000 | 0 | October 5, 2023 | echo.epa.gov |
| Ab State 647 Battery | Loco Hills | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Apache, Palmillo 21 CTB | Atoka | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Apache Corporation, a State 42 Battery | Loco Hills | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Apache Corporation, Tony Federal Battery | Loco Hills | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Apache-L W Ward & Schenck Battery | Tatum | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Birdie Federal NO3 Battery | Loco Hills | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| D State 49 Battery | Loco Hills | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Empire Abo D40 Tank Battery | Loco Hills | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Ghost Rider CTB | Jal | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Palmillo 14-15 State Battery NO3 | Carlsbad | NM | 1 | $4,017,191 | 0 | April 11, 2024 | echo.epa.gov |
| Mccord Enterprises 23 Wca 2H 3H and 4H | Loving | NM | 8 | $3,520,000 | 0 | March 21, 2023 | echo.epa.gov |
| Denton Gas Plant | Lovington | NM | 2 | $3,275,243 | 0 | July 20, 2023 | echo.epa.gov |
| Eog Resources, Magnolia 15 Federal Com 703H, 705H | Jal | NM | 6 | $2,475,000 | 0 | January 17, 2025 | echo.epa.gov |
| DJR Operating, Crow Canyon Unit N19 2408 | Bloomfield | NM | 5 | $2,130,000 | 0 | August 31, 2023 | echo.epa.gov |
| Permian Resources, Donkey Kong | Eunice | NM | 3 | $2,073,759 | 0 | August 19, 2026 | echo.epa.gov |
| Chevron USA, Skeen 23 6H | Carlsbad | NM | 4 | $1,486,023 | 0 | July 9, 2026 | echo.epa.gov |
| Permian Resources-Sheba & Solomon-Solomon Fed Com 505H | Jal | NM | 2 | $1,382,506 | 0 | August 19, 2026 | echo.epa.gov |
| Eog Resources, Perdomo BMP State Com CTB | Malaga | NM | 3 | $1,237,500 | 0 | January 17, 2025 | echo.epa.gov |
| Gila 12 Federal No 2H Tank Battery | Malaga | NM | 1 | $1,200,000 | 1 | December 15, 2023 | echo.epa.gov |
| Matador, Anne Com 15 Facility | Malaga | NM | 2 | $1,150,000 | 0 | May 15, 2023 | echo.epa.gov |
| Matador, B Banker Facility | Loving | NM | 2 | $1,150,000 | 0 | May 15, 2023 | echo.epa.gov |
| Matador, Charlie Sweeney Facility | Loving | NM | 2 | $1,150,000 | 0 | May 15, 2023 | echo.epa.gov |
| Matador, Coleman Facility | Loving | NM | 2 | $1,150,000 | 0 | May 15, 2023 | echo.epa.gov |
| Matador, DR. K Facility | Loving | NM | 2 | $1,150,000 | 0 | May 15, 2023 | echo.epa.gov |
| Matador, DR. Scrivner Facility | Malaga | NM | 2 | $1,150,000 | 0 | May 15, 2023 | echo.epa.gov |
By program
| Program | Facilities | Formal actions | Informal actions | Penalties | Facilities with quarters in significant noncompliance |
|---|
| Clean Air Act | 221 | 211 | 165 | $1,154,627,250 | 28 |
| Clean Water Act | 408 | 246 | 5 | $443,200 | 282 |
| Hazardous waste (RCRA) | 116 | 75 | 44 | $2,769,292 | 23 |
| Drinking water (SDWA) | 32 | 7 | 977 | $0 | 0 |
Updated November 7, 2026. Read from US EPA, Enforcement and Compliance History Online (ECHO). Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.