Data / Environmental compliance / Mississippi
Environmental compliance in Mississippi: 538 facilities, $15,060,940 in penalties (2021 to 2026)
EPA's ECHO database lists 538 facilities in Mississippi with a formal enforcement action, penalties of $5,000 or more, three or more quarters in significant noncompliance or a federal case in the five years to November 1, 2026: 288 formal actions, 2,016 informal actions and $15,060,940 in penalties.
SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.
- State
- Mississippi
- Facilities
- 538
- Formal enforcement actions
- 288
- Informal actions
- 2,016
- Penalties
- $15,060,940 ($7,719,582 from federal cases)
- Facilities with three or more quarters in significant noncompliance
- 348
Industries with the largest penalties
| Industry | NAICS | Facilities | Penalties |
|---|
| Couriers and Express Delivery Services | 4921 | 13 | $5,300,000 |
| Glass and Glass Product Manufacturing | 3272 | 1 | $3,012,000 |
| Basic Chemical Manufacturing | 3251 | 11 | $1,201,750 |
| General Freight Trucking | 4841 | 3 | $862,900 |
| Water, Sewage and Other Systems | 2213 | 141 | $773,890 |
| Nonferrous Metal (except Aluminum) Production and Processing | 3314 | 1 | $400,000 |
| Ship and Boat Building | 3366 | 2 | $300,000 |
| Sawmills and Wood Preservation | 3211 | 13 | $254,745 |
| Veneer, Plywood, and Engineered Wood Product Manufacturing | 3212 | 4 | $217,500 |
| Pulp, Paper, and Paperboard Mills | 3221 | 3 | $200,000 |
| Nonmetallic Mineral Mining and Quarrying | 2123 | 15 | $179,550 |
| Steel Product Manufacturing from Purchased Steel | 3312 | 1 | $175,000 |
| Waste Treatment and Disposal | 5622 | 4 | $128,250 |
| Other Food Manufacturing | 3119 | 2 | $122,500 |
| Cement and Concrete Product Manufacturing | 3273 | 11 | $103,002 |
| Grain and Oilseed Milling | 3112 | 4 | $92,400 |
| Petroleum and Coal Products Manufacturing | 3241 | 2 | $78,631 |
| Residential Building Construction | 2361 | 3 | $73,750 |
| Farm Product Raw Material Merchant Wholesalers | 4245 | 1 | $73,125 |
| Nonresidential Building Construction | 2362 | 2 | $70,500 |
| Oil and Gas Extraction | 2111 | 1 | $65,000 |
| Coating, Engraving, Heat Treating, and Allied Activities | 3328 | 4 | $48,375 |
| Other Chemical Product and Preparation Manufacturing | 3259 | 3 | $40,324 |
| Motor Vehicle Manufacturing | 3361 | 1 | $40,000 |
| Agriculture, Construction, and Mining Machinery Manufacturing | 3331 | 1 | $37,270 |
| Architectural and Structural Metals Manufacturing | 3323 | 6 | $35,000 |
| Resin, Synthetic Rubber, and Artificial and Synthetic Fibers and Filaments Manufacturing | 3252 | 2 | $33,750 |
| Converted Paper Product Manufacturing | 3222 | 2 | $31,860 |
| Iron and Steel Mills and Ferroalloy Manufacturing | 3311 | 1 | $30,000 |
| Electric Power Generation, Transmission and Distribution | 2211 | 5 | $26,250 |
| Dairy Product Manufacturing | 3115 | 1 | $25,500 |
| Pharmaceutical and Medicine Manufacturing | 3254 | 2 | $25,250 |
| Petroleum and Petroleum Products Merchant Wholesalers | 4247 | 2 | $25,000 |
| Other Miscellaneous Manufacturing | 3399 | 1 | $25,000 |
| Aquaculture | 1125 | 2 | $24,000 |
| Printing and Related Support Activities | 3231 | 1 | $23,750 |
| Boiler, Tank, and Shipping Container Manufacturing | 3324 | 2 | $22,500 |
| Natural Gas Distribution | 2212 | 4 | $22,500 |
| Animal Food Manufacturing | 3111 | 2 | $22,500 |
| Beverage Manufacturing | 3121 | 1 | $22,500 |
Facilities with the largest penalties
Ranked by penalties of the last five years. Each row links to EPA's facility report.
| Facility | City | State | Formal actions | Penalties | Quarters in significant noncompliance | Latest penalty | Source |
|---|
| United Parcel Service Inc, Columbus | Columbus | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service Inc, Gulfport | Gulfport | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service Inc, Laurel Facility | Laurel | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service Inc, Tupelo Center | Tupelo | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service Inc, Vicksburg Center | Vicksburg | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Batesville | Batesville | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Booneville | Booneville | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Greenwood | Greenwood | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Hattiesburg | Hattiesburg | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Jackson Hub | Jackson | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Natchez | Natchez | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Pascagoula | Gautier | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| United Parcel Service, Inc., Ridgeland | Ridgeland | MS | 2 | $5,300,000 | 0 | October 17, 2022 | echo.epa.gov |
| View Inc | Olive Branch | MS | 3 | $3,012,000 | 0 | December 14, 2023 | echo.epa.gov |
| Tforce Freight, Jackson | Pearl | MS | 2 | $860,400 | 0 | December 12, 2022 | echo.epa.gov |
| Tforce Freight, Tupelo | Tupelo | MS | 2 | $860,400 | 0 | December 12, 2022 | echo.epa.gov |
| Mississippi Silicon LLC | Burnsville | MS | 1 | $400,000 | 3 | August 27, 2024 | echo.epa.gov |
| Westlake Chemicals & Vinyls LLC | Aberdeen | MS | 1 | $340,000 | 4 | November 18, 2024 | echo.epa.gov |
| United States Marine Inc. | Gulfport | MS | 3 | $300,000 | 7 | September 10, 2026 | echo.epa.gov |
| International Paper, Columbus Mill | Columbus | MS | 2 | $200,000 | 6 | December 24, 2025 | echo.epa.gov |
| Jindal Tubular USA LLC | Bay ST. Louis | MS | 1 | $175,000 | 0 | January 12, 2022 | echo.epa.gov |
| Amite Bioenergy LLC, Wood Pellet Manufacturing Facility | Gloster | MS | 1 | $150,000 | 0 | September 11, 2024 | echo.epa.gov |
| Superior Pallet Company | City of Jackson | MS | 1 | $125,000 | 0 | July 24, 2025 | echo.epa.gov |
| Shuqualak Lumber Company Inc, Planer Mill Division | Shuqualak | MS | 1 | $122,815 | 12 | May 27, 2025 | echo.epa.gov |
| USA Yeast Company LLC | Hattiesburg | MS | 1 | $122,500 | 0 | July 6, 2026 | echo.epa.gov |
| Bfi Waste Systems of Mississippi LLC, Little Dixie Landfill | Ridgeland | MS | 3 | $119,000 | 0 | January 13, 2026 | echo.epa.gov |
| Chemours Delisle Plant | Pass Christian | MS | 2 | $78,750 | 1 | November 13, 2023 | echo.epa.gov |
| Kentucky Tennesse Clay Company, Aldison Mine | Crenshaw | MS | 1 | $78,750 | 0 | June 9, 2023 | echo.epa.gov |
| Calgon Carbon Corporation | Bay ST Louis | MS | 2 | $78,500 | 2 | May 10, 2025 | echo.epa.gov |
| Hunt Sandersville Refinery | Sandersville | MS | 1 | $75,000 | 3 | November 18, 2024 | echo.epa.gov |
| Farmers Grain Terminal Inc, Greenwood | Greenwood | MS | 1 | $73,125 | 0 | June 14, 2023 | echo.epa.gov |
| Williams Equipment and Supply | Shannon | MS | 1 | $67,500 | 0 | August 29, 2023 | echo.epa.gov |
| Tronox LLC, Hamilton Facility | Hamilton | MS | 1 | $65,000 | 0 | July 19, 2022 | echo.epa.gov |
| Cottonseed Co-Op Corporation | Jonestown | MS | 1 | $57,400 | 5 | October 23, 2024 | echo.epa.gov |
| Pinelands LLC | Flowood | MS | 2 | $54,000 | 0 | March 11, 2025 | echo.epa.gov |
| Hood Industries Inc, Wiggins | Wiggins | MS | 2 | $52,500 | 4 | November 12, 2024 | echo.epa.gov |
| Sequa Corporation, DBA Precoat Metals | Jackson | MS | 1 | $48,375 | 7 | May 13, 2022 | echo.epa.gov |
| Audubon Lake Subdivision | Gulfport | MS | 1 | $47,500 | 0 | September 20, 2024 | echo.epa.gov |
| Meritage Homes of Mississippi, Inc, Greens at Gulf Hills | Ocean Springs | MS | 1 | $47,500 | 0 | September 20, 2024 | echo.epa.gov |
| Meritage Homes of Mississippi, Inc,the Preserve at Parker Creek | Biloxi | MS | 1 | $47,500 | 0 | September 20, 2024 | echo.epa.gov |
| Savannah Commons | Ocean Springs | MS | 1 | $47,500 | 0 | September 20, 2024 | echo.epa.gov |
| Hammett Gravel Company Inc, HDP Mine | Lexington | MS | 1 | $46,000 | 0 | August 29, 2024 | echo.epa.gov |
| Facilities Performance Group, LLC | Hernando | MS | 1 | $42,600 | 0 | March 9, 2023 | echo.epa.gov |
| Toyota Motor Manufacturing Mississippi Inc | Blue Springs | MS | 1 | $40,000 | 3 | August 16, 2024 | echo.epa.gov |
| Laurel Plant | Laurel | MS | 2 | $37,500 | 0 | July 17, 2026 | echo.epa.gov |
| Nouryon Pulp and Performance Chemicals | Columbus | MS | 1 | $37,500 | 1 | February 10, 2026 | echo.epa.gov |
| MTD Products | Verona | MS | 2 | $37,270 | 3 | August 13, 2024 | echo.epa.gov |
| Resinall Mississippi, Hattiesburg | Hattiesburg | MS | 1 | $33,750 | 0 | February 28, 2024 | echo.epa.gov |
| B and B Concrete Co Inc, Tupelo Div | Tupelo | MS | 1 | $33,601 | 0 | September 25, 2026 | echo.epa.gov |
| B and B Concrete Company Inc, Tupelo Division | Tupelo | MS | 1 | $33,601 | 0 | September 25, 2026 | echo.epa.gov |
| Adlam Films LLC | Shannon | MS | 1 | $31,860 | 0 | December 22, 2022 | echo.epa.gov |
| Scotch Plywood Company Inc | Waynesboro | MS | 1 | $30,000 | 0 | September 22, 2026 | echo.epa.gov |
| Oil Dri Production Company | Ripley | MS | 1 | $26,300 | 0 | October 21, 2025 | echo.epa.gov |
| Mississippi Power Company, Plant Jack Watson | Gulfport | MS | 1 | $26,250 | 0 | December 28, 2023 | echo.epa.gov |
| East Side Jersey Dairy Inc | Kosciusko | MS | 1 | $25,500 | 5 | April 30, 2025 | echo.epa.gov |
| Batesville Manufacturing Inc, Vicksburg | Vicksburg | MS | 1 | $25,000 | 0 | June 18, 2024 | echo.epa.gov |
| Gold Coast Commodities Inc | Brandon | MS | 1 | $25,000 | 0 | April 17, 2026 | echo.epa.gov |
| Gulfport, City of, MS4 Stormwater Management Program | Gulfport | MS | 1 | $25,000 | 0 | May 4, 2022 | echo.epa.gov |
| Lincoln Terminal Company Inc | Natchez | MS | 1 | $25,000 | 0 | April 12, 2023 | echo.epa.gov |
| Steel Dynamics Columbus, LLC | Columbus | MS | 1 | $24,300 | 0 | December 6, 2023 | echo.epa.gov |
| Consolidated Catfish Co LLC | Isola | MS | 1 | $24,000 | 0 | January 26, 2024 | echo.epa.gov |
| Drexel Chemical Co | Tunica | MS | 1 | $23,750 | 0 | May 16, 2024 | echo.epa.gov |
| Ardagh Metal Packaging USA Corp | Olive Branch | MS | 1 | $22,500 | 1 | April 12, 2023 | echo.epa.gov |
| Meritage Homes of Mississippi, Inc, Diamondhead Subdivision | Diamondhead | MS | 1 | $22,500 | 0 | September 20, 2024 | echo.epa.gov |
| Nitrous Oxide Corp | Yazoo City | MS | 1 | $22,500 | 0 | August 7, 2025 | echo.epa.gov |
| Phibro RCB LLC | Natchez | MS | 1 | $22,500 | 0 | July 28, 2023 | echo.epa.gov |
| Sanctuary Trails | Gulfport | MS | 1 | $22,500 | 0 | September 20, 2024 | echo.epa.gov |
| Southern Natural Gas Company LLC, Gwinville Compressor Station | New Hebron | MS | 1 | $22,500 | 0 | March 16, 2026 | echo.epa.gov |
| Tyson Farms, Inc., DBA River Valley Ingredients | Forest | MS | 1 | $22,500 | 0 | November 4, 2024 | echo.epa.gov |
| Wis Pak of Hattiesburg, LLC | Hattiesburg | MS | 1 | $22,500 | 0 | October 9, 2024 | echo.epa.gov |
| Valvoline, Inc. | Hernando | MS | 1 | $22,074 | 1 | June 17, 2025 | echo.epa.gov |
| Sherwin-Williams Company | Olive Branch | MS | 1 | $21,864 | 0 | December 6, 2024 | echo.epa.gov |
| Hankins Lumber Company Inc, Elliott | Elliott | MS | 1 | $20,250 | 7 | May 10, 2025 | echo.epa.gov |
| Fabricator's Supply LLC | West Point | MS | 1 | $20,000 | 0 | June 20, 2023 | echo.epa.gov |
| Tri State Pole and Piling Inc | Lucedale | MS | 1 | $20,000 | 0 | November 15, 2023 | echo.epa.gov |
| Crystal Finishing Systems Inc | Senatobia | MS | 2 | $19,875 | 2 | May 9, 2022 | echo.epa.gov |
| Blue Mountain Production Company, Taylor and Plant Property Mine | Blue Mountain | MS | 1 | $19,125 | 0 | October 24, 2022 | echo.epa.gov |
| Meginley Subdivision | D'iberville | MS | 1 | $18,750 | 0 | July 14, 2022 | echo.epa.gov |
| Porter Construction MS LLC, Farley Road Subdivision Phase Two | Byhalia | MS | 1 | $18,750 | 0 | October 22, 2024 | echo.epa.gov |
| Apollo Petroleum | Picayune | MS | 1 | $18,250 | 0 | December 5, 2024 | echo.epa.gov |
| Worthington Cylinders Mississippi LLC | New Albany | MS | 1 | $18,000 | 8 | May 26, 2026 | echo.epa.gov |
| Natureplex | Olive Branch | MS | 1 | $17,750 | 0 | May 3, 2024 | echo.epa.gov |
| Attala Steel Industries LLC | Kosciusko | MS | 1 | $17,500 | 6 | May 26, 2026 | echo.epa.gov |
| Usg Interiors, LLC | Greenville | MS | 1 | $17,500 | 6 | March 14, 2025 | echo.epa.gov |
| Attala Steel Industries LLC | Kosciusko | MS | 1 | $17,500 | 1 | May 26, 2026 | echo.epa.gov |
| Wallace Lumber | Summit | MS | 1 | $17,500 | 1 | April 27, 2023 | echo.epa.gov |
| Ronny Williamson Construction Inc, Williamson Mine | Florence | MS | 1 | $16,875 | 0 | February 9, 2022 | echo.epa.gov |
| Gluckstadt Crossing | Gluckstadt | MS | 1 | $16,500 | 0 | May 20, 2025 | echo.epa.gov |
| Noon Batesville, LLC, Shopping Center Covenant Drive | Batesville | MS | 1 | $16,500 | 0 | May 20, 2025 | echo.epa.gov |
| Pierce Construction and Contract Hauling Inc, Forrest Property | Richland | MS | 1 | $15,000 | 4 | July 2, 2025 | echo.epa.gov |
| Accu Fabrication & Construction | Moss Point | MS | 1 | $15,000 | 0 | June 6, 2023 | echo.epa.gov |
| Blain Sand and Gravel Inc, Natchez | Natchez | MS | 1 | $15,000 | 0 | April 9, 2024 | echo.epa.gov |
| C F Rail Services LLC, Mississippi Railcar | Meridian | MS | 1 | $15,000 | 0 | March 4, 2025 | echo.epa.gov |
| Hi Lo Farms | Aberdeen | MS | 1 | $15,000 | 0 | August 10, 2026 | echo.epa.gov |
| Pierce Construction and Contract Hauling, Star Pit | Star | MS | 1 | $15,000 | 0 | July 2, 2025 | echo.epa.gov |
| Gollott Brothers Seafood Company Inc | Biloxi | MS | 1 | $14,500 | 0 | November 8, 2023 | echo.epa.gov |
| Copiah County Industrial Park | Hazlehurst | MS | 2 | $14,000 | 11 | September 26, 2024 | echo.epa.gov |
| Hancock County Land Acquisitions, LLC | Picayune | MS | 1 | $14,000 | 0 | February 14, 2022 | echo.epa.gov |
| JWM Development LLC, Highlands Subdivision Phase 12 | Oxford | MS | 1 | $14,000 | 0 | September 27, 2022 | echo.epa.gov |
| Halley Construction LLC Brookhaven Development | Lamar | MS | 1 | $13,500 | 0 | June 17, 2025 | echo.epa.gov |
By program
| Program | Facilities | Formal actions | Informal actions | Penalties | Facilities with quarters in significant noncompliance |
|---|
| Clean Air Act | 101 | 50 | 88 | $2,181,366 | 14 |
| Clean Water Act | 457 | 151 | 1,070 | $5,011,344 | 317 |
| Hazardous waste (RCRA) | 101 | 22 | 34 | $106,048 | 13 |
| Drinking water (SDWA) | 35 | 6 | 824 | $0 | 0 |
Updated November 7, 2026. Read from US EPA, Enforcement and Compliance History Online (ECHO). Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.