# Critical Path Reconstruction Inc., Modesto: 1 OSHA citation

Updated November 9, 2026.

OSHA recorded 1 inspection at Critical Path Reconstruction Inc., 3905 Dale RD., Modesto, CA 95356, on November 26, 2025. 1 inspection ended in citations: 1 citation with $2,475 in initial penalties and $2,475 in current penalties. The latest citation was issued April 2, 2026.

## The full lists

This record is a row of these lists. Pay by card with no account. Prices exclude VAT. CSV and Excel files with the columns this page does not show (establishment, street, city, state, ZIP, NAICS and 9 more), which open on your screen as soon as the payment clears and come by email.

- [OSHA inspections with citations in California](https://specstream.ai/data/workplace-safety/state/california): 20,594 rows, inspections opened since November 9, 2021 that ended in a citation, $285.94, or the new rows each week for $19 a month. Buy: https://specstream.ai/data/workplace-safety/state/california
- [OSHA inspections with citations](https://specstream.ai/data/workplace-safety): 177,500 rows, inspections opened since November 9, 2021 that ended in a citation, $1,855, or the new rows each week for $19.30 a month. Buy: https://specstream.ai/data/workplace-safety

SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.

- Site: 3905 Dale RD., Modesto, CA 95356
- Industry: [238160 Roofing Contractors](https://specstream.ai/data/workplace-safety/industry/2381-foundation-structure-and-building-exterior-contractors/california)
- Ownership: Private
- Employees at the site: 3 (as recorded at the latest inspection)
- Inspections: 1, of which 1 with citations
- Citations: 1
- Penalties: $2,475 initial, $2,475 current

## Inspections

Every inspection OSHA opened at this site since November 9, 2021.

| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
| --- | --- | --- | --- | --- | --- | --- | --- |
| November 26, 2025 | June 25, 2026 | Complaint | Partial | Safety | 1 | $2,475 | [osha.gov](https://www.osha.gov/ords/imis/establishment.inspection_detail?id=348617549) |

## Citations

One row for each citation item, newest first. Gravity is OSHA's level of gravity for serious violations.

| Inspection opened | Citation | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| November 26, 2025 | 01001 | 1731(C)(1) |  | Serious | 10 | April 2, 2026 | $2,475 | $2,475 | [osha.gov](https://www.osha.gov/ords/imis/establishment.inspection_detail?id=348617549) |

## Also on SpecStream

- [All OSHA citations in Foundation, Structure, and Building Exterior Contractors in California](https://specstream.ai/data/workplace-safety/industry/2381-foundation-structure-and-building-exterior-contractors/california)
- [OSHA citations in California](https://specstream.ai/data/workplace-safety/state/california)

Source: [US Department of Labor, OSHA enforcement data](https://data.dol.gov/datasets/10334). Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor.

Free to reuse with credit to SpecStream under [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/).
