# Environmental compliance in Texas: 3,688 facilities, page 23

Updated November 7, 2026.

Facilities with the largest penalties, 2,201 to 2,300 of 3,688, in the same order as page 1.

## The full lists

This record is a row of these lists. Pay by card with no account. Prices exclude VAT. CSV and Excel files with the columns this page does not show (EPA registry ID (FRS), street, county, ZIP, EPA region, NAICS codes and 22 more), which open on your screen as soon as the payment clears and come by email.

- [Facilities with EPA enforcement actions and penalties in Texas](https://specstream.ai/data/environmental-compliance/state/texas): 3,688 rows, facilities with a formal action, penalties of $5,000 or more, 3 or more quarters in significant noncompliance or a federal case, in the five years from November 2, 2021 to November 1, 2026, $116.88, or the new rows each week for $19 a month. Buy: https://specstream.ai/data/environmental-compliance/state/texas
- [Facilities with EPA enforcement actions and penalties](https://specstream.ai/data/environmental-compliance): 58,030 rows, facilities with a formal action, penalties of $5,000 or more, 3 or more quarters in significant noncompliance or a federal case, in the five years from November 2, 2021 to November 1, 2026, $660.30, or the new rows each week for $59.60 a month. Buy: https://specstream.ai/data/environmental-compliance

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

## Facilities with the largest penalties, page 23

| Facility | City | State | Formal actions | Penalties | Quarters in significant noncompliance | Latest penalty | Source |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Boerne Bulk Plant | Boerne | TX | 1 | $875 | 0 | November 21, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070359249) |
| Bollman Industries | San Angelo | TX | 1 | $875 | 0 | February 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110031316136) |
| Bpi Pit | Bryan | TX | 1 | $875 | 0 | August 1, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071345882) |
| Bruces Sand Pit Silsbee | Silsbee | TX | 1 | $875 | 0 | January 24, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070363316) |
| Buffalo Asphalt Plant | Buffalo | TX | 1 | $875 | 0 | September 13, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070199234) |
| Caliber Collision, Longview TX 3355 | Longview | TX | 1 | $875 | 0 | August 27, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071668355) |
| Canyon Creek | Granbury | TX | 1 | $875 | 0 | August 30, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071238757) |
| Canyon Creek Community | Granbury | TX | 1 | $875 | 0 | April 7, 2026 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110072109790) |
| Canyon West Golf Club | Weatherford | TX | 1 | $875 | 0 | March 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071144232) |
| Cedar Point | Livingston | TX | 1 | $875 | 0 | March 29, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071093363) |
| Chromium | Lufkin | TX | 1 | $875 | 0 | October 10, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110013690951) |
| City of Hillsbor0 | Hillsboro | TX | 1 | $875 | 0 | October 10, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070377473) |
| City of Jacinto City Wastewater Treatment Facility | Jacinto City | TX | 1 | $875 | 0 | December 13, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110034206552) |
| Clear Creek Shelving Project at Clearview Avenue | Friendswood | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071144046) |
| Creekside Addition | Sweetwater | TX | 1 | $875 | 0 | January 7, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071814118) |
| Creekside Addition | Sweetwater | TX | 1 | $875 | 0 | January 7, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071239634) |
| Cresson Development | Cresson | TX | 1 | $875 | 0 | January 24, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071298826) |
| Custom Skin | San Angelo | TX | 1 | $875 | 0 | December 21, 2021 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110005193423) |
| Davis Park | Lubbock | TX | 1 | $875 | 0 | May 3, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070930921) |
| Deats Farm | Azle | TX | 1 | $875 | 0 | January 25, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070685616) |
| Deer Hollow, Home Building | Bartonville | TX | 1 | $875 | 0 | August 5, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071849048) |
| Dewalt Sand Pit | Sugar Land | TX | 1 | $875 | 0 | December 19, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070548734) |
| Eagles Bluff | Brock | TX | 1 | $875 | 0 | February 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071068859) |
| Eagles Bluff | Brock | TX | 1 | $875 | 0 | January 25, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071067316) |
| Eagles Bluff | Parker County | TX | 1 | $875 | 0 | January 25, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071076022) |
| Eagles Bluff, Combined Relocation Services | Weatherford | TX | 1 | $875 | 0 | January 25, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071065356) |
| Eagles Bluff Lot 52 | Weatherford | TX | 1 | $875 | 0 | April 19, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071077306) |
| Earth Haulers | Euless | TX | 1 | $875 | 0 | December 13, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070362848) |
| Eggemeyer Land Clearing Brush Recycling Facility | New Braunfels | TX | 1 | $875 | 0 | August 1, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071358556) |
| Elizabethtown Cemetery Parking Lot | Roanoke | TX | 1 | $875 | 0 | May 13, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071866630) |
| Emerald Cottages Westpointe Phase 2 | New Bruanfels | TX | 1 | $875 | 0 | November 15, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071280321) |
| Falcon Ridge | New Fairview | TX | 1 | $875 | 0 | December 21, 2021 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070627807) |
| Georgia Pacific Resins Inc | Houston | TX | 1 | $875 | 0 | July 18, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110000460947) |
| Grady Hayes and Hartley Grace Addition | Mineola | TX | 1 | $875 | 0 | October 31, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071319570) |
| Grande Superior Storage | Tyler | TX | 1 | $875 | 0 | January 31, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071324821) |
| Grande Village | Tyler | TX | 1 | $875 | 0 | November 7, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071437444) |
| Greenbriar Subdivision | Gilmer | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071181434) |
| Hadley Farms | Godley | TX | 1 | $875 | 0 | July 16, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071660123) |
| Hagood Ranch | Springtown | TX | 1 | $875 | 0 | December 16, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071944709) |
| Harris County Wcid 21 Wastewater Treatment Plant | Channelview | TX | 1 | $875 | 0 | October 10, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110033971986) |
| Hidden Springs Ranch, Ashlyn Homes | Weatherford | TX | 1 | $875 | 0 | April 6, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071080997) |
| Hidden Springs Ranch, MK Homes | Weatherford | TX | 1 | $875 | 0 | February 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071083077) |
| Honeybee RV Resort | Springtown | TX | 1 | $875 | 0 | May 13, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071880274) |
| Hunters Landing | Abilene | TX | 1 | $875 | 0 | January 31, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071336702) |
| Inertia Wind Project | Haskell | TX | 1 | $875 | 0 | October 10, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071203603) |
| Ingenia Polymers Usgc | La Porte | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071299450) |
| Integrity Delaware-Kingsville | Kingsville | TX | 1 | $875 | 0 | June 20, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070373538) |
| Islands of Rockport | Rockport | TX | 1 | $875 | 0 | September 20, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071235521) |
| Joshua Yard | Joshua | TX | 1 | $875 | 0 | September 8, 2026 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110072183518) |
| JWS Crandall, North of US-175 | Crandall | TX | 1 | $875 | 0 | August 26, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071878399) |
| Kag Energy | Live Oak | TX | 1 | $875 | 0 | March 24, 2026 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071945401) |
| Kelly Ranch La Dorada | Aledo | TX | 1 | $875 | 0 | August 5, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071863927) |
| Khalifa Court | Flint | TX | 1 | $875 | 0 | July 11, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071369725) |
| Lakewood Hills | Granbury | TX | 1 | $875 | 0 | June 7, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071155695) |
| Lampasas River Place | Lampasas | TX | 1 | $875 | 0 | January 25, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070925816) |
| Leon Plant WWTP | Gatesville | TX | 1 | $875 | 0 | July 11, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110064622733) |
| Mccown Veneer | Bullard | TX | 1 | $875 | 0 | April 19, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070884037) |
| Mountain Shadows Ranch | Abilene | TX | 1 | $875 | 0 | December 21, 2021 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071076456) |
| Mystic Mountain Ranch | Energy | TX | 1 | $875 | 0 | August 30, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071237296) |
| North Ash Addition | Muenster | TX | 1 | $875 | 0 | June 4, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071427397) |
| Northeast Wastewater Treatment Plant | Copperas Cove | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071344981) |
| Northwest Harris County Mud 15 WWTP | Tomball | TX | 1 | $875 | 0 | December 13, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110009777553) |
| Northwest Harris County Mud 20 | Houston | TX | 1 | $875 | 0 | August 1, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071346527) |
| Northwest Harris County Mud 20 WWTP | Houston | TX | 1 | $875 | 0 | August 1, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070375971) |
| Northwest Plant | Copperas Cove | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070358871) |
| NW Harris County Mud 20 WWTP | Houston | TX | 1 | $875 | 0 | August 1, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110002044234) |
| Ocean Reef Cottages | Rockport | TX | 1 | $875 | 0 | July 18, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071280415) |
| Patriot Mining & Materials Site2 | Scurry | TX | 1 | $875 | 0 | July 1, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071906570) |
| Patriot Mining and Materials North Pit | Chatfield | TX | 1 | $875 | 0 | September 10, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071783649) |
| Peterson Pit | Woodlawn | TX | 1 | $875 | 0 | June 4, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071643887) |
| Peterson Pit | Woodlawn | TX | 1 | $875 | 0 | June 4, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071344883) |
| Pipeline Plastics Decatur Facility | Decatur | TX | 1 | $875 | 0 | November 7, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070518739) |
| Propell North American, Main | Granbury | TX | 1 | $875 | 0 | June 4, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071645798) |
| Prosperity Subdivision | Pittsburg | TX | 1 | $875 | 0 | July 18, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071240711) |
| Quail Run Estates Phase 1 | Grandview | TX | 1 | $875 | 0 | January 24, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070874244) |
| Ra Materials | Comfort | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070359368) |
| Reconstruction of Socorro High School for Socorro Isd | Socorro | TX | 1 | $875 | 0 | December 13, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070596988) |
| Reichhold Reactive Polymers Division Houston Plant | Houston | TX | 1 | $875 | 0 | July 18, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110000461045) |
| Reliance Aeroproducts International | Mansfield | TX | 1 | $875 | 0 | November 7, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070554072) |
| Road Ranger 281 | Cisco | TX | 1 | $875 | 0 | March 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071073693) |
| Rosehill Meadow Section 1 | Tomball | TX | 1 | $875 | 0 | July 11, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071148130) |
| Saddlebrook Subdivision | Hallsville | TX | 1 | $875 | 0 | August 27, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071669475) |
| Sawmill Road | Magnolia | TX | 1 | $875 | 0 | September 20, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070917352) |
| Silver Saddle | Weatherford | TX | 1 | $875 | 0 | March 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071081914) |
| Silver Sage Farms | Parker County | TX | 1 | $875 | 0 | December 21, 2021 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071066098) |
| Smith To Edroy 69KV Transmission Line Rebuild | Edroy | TX | 1 | $875 | 0 | June 4, 2024 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071658638) |
| Solaris Oil Field Infrastructure | Early | TX | 1 | $875 | 0 | January 13, 2026 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110067272506) |
| South Wastewater Treatment Plant | Copperas Cove | TX | 1 | $875 | 0 | August 9, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110064641179) |
| Southwest Bulk | Cleburne | TX | 1 | $875 | 0 | August 26, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071942895) |
| Stardust Ranch Phase 2 | Northlake | TX | 1 | $875 | 0 | February 1, 2022 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070564258) |
| Stillhouse Branch WWTP | Gatesville | TX | 1 | $875 | 0 | July 11, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070366759) |
| Stone Creek Ranch | Fair Oaks Ranch | TX | 1 | $875 | 0 | June 3, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071657310) |
| The Hills at Pilot Point | Pilot Point | TX | 1 | $875 | 0 | January 24, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071308719) |
| The Local on Main | Taylor | TX | 1 | $875 | 0 | December 19, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071436863) |
| The Ranch on Rhones Quarter | Whitehouse | TX | 1 | $875 | 0 | August 29, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071371294) |
| The Reserve at Timber Creek Unit 1 | Lindale | TX | 1 | $875 | 0 | July 18, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071362611) |
| The Reserve at Tuscany Park Phase II & III | Mineola | TX | 1 | $875 | 0 | June 20, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071346991) |
| Thunder Rock | Marble Falls | TX | 1 | $875 | 0 | October 14, 2025 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110071944633) |
| Top-Way Materials | Rhome | TX | 1 | $875 | 0 | July 11, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110035028733) |
| Usar | Wilmer | TX | 1 | $875 | 0 | November 7, 2023 | [echo.epa.gov](https://echo.epa.gov/detailed-facility-report?fid=110070866889) |

- [Previous page](https://specstream.ai/data/environmental-compliance/state/texas/page/22)
- [Next page](https://specstream.ai/data/environmental-compliance/state/texas/page/24)
- [Page 1](https://specstream.ai/data/environmental-compliance/state/texas)

Source: [US EPA, Enforcement and Compliance History Online (ECHO)](https://echo.epa.gov/tools/data-downloads). Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA.

Free to reuse with credit to SpecStream under [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/).
